Contiqa Systems

PINT-AE Readiness Advisory

Field-by-field, rule-by-rule preparation for PINT-AE BIS v1.0.2 compliance

PINT-AE is not a print format — it’s a UBL 2.1 XML specification with 51 mandatory fields and 114 schematron business rules, several governing UAE-specific BTAE extension fields that don’t exist in standard ERP invoice output. Getting this mapping wrong doesn’t fail quietly; it fails at ASP submission, after the transaction has already happened.

What's included

Scope of the engagement

  • Full 51-field mapping against your ERP’s current invoice output
  • BTAE extension field gap analysis and development planning
  • Schematron rule-by-rule validation testing across all 114 mandatory business rules
  • Code list conformance checks — UNCL1001 invoice type codes, UNCL4461 payment means, UNECE Rec 20 unit codes, ISO 3166 country codes, ISO 4217 currency codes
  • Test invoice generation and ASP pre-submission validation
Why Contiqa

Practitioner-led, not vendor-led

Contiqa’s founder was directly involved in shaping the PINT-AE specification through the Ministry of Finance E-Invoicing Consultative Group — including the business rules that govern it. That’s a level of rule-level familiarity most implementation teams are reading about for the first time.

Background reading

Go deeper before you talk to us

Talk to Contiqa about pint-ae readiness advisory.

Book a discovery call